Environ is an environmental clearance consultant in Ahmedabad that screens projects against the EIA Notification, 2006 and supports the Category A and Category B (B1 / B2) clearance process, from screening and scoping to appraisal, so industrial and infrastructure projects in Gujarat enter the consent stage on the right footing.
Environmental Clearance is a statutory approval under the Environment Impact Assessment (EIA) Notification, 2006 (issued under the Environment (Protection) Act, 1986), required before construction or expansion begins for projects and activities listed in the Notification's schedule: new industrial units above specified capacity thresholds, expansions beyond specified limits, mining, infrastructure, and other categories. It is distinct from, and generally a prerequisite to, GPCB's Consent to Establish.
Projects listed in the EIA schedule fall into Category A (larger scale/higher impact, appraised at the Union level by the Expert Appraisal Committee under MoEFCC) or Category B (appraised by the State Environment Impact Assessment Authority — SEIAA — and its State Expert Appraisal Committee, SEAC). Category B is further split into B1 (requiring a full EIA study and public hearing) and B2 (exempted from the detailed EIA study, based on specific criteria in the Notification).
Because CTE relies on the project configuration and conditions established during EC (where applicable), sequencing matters. Attempting to secure CTE before EC on an EC-triggered project creates rework and delay, so confirming applicability early, at the project-planning stage, avoids this.
A proposed project is first screened against the EIA Notification schedule to confirm whether EC applies and at which category. Environ then supports the documentation and appraisal process accordingly.
Teams searching for an EC consultant in India or an environmental clearance consultant in Gujarat are usually trying to answer two questions: does my project need clearance at all, and at which category? Environ answers that first, before documentation begins. Because the clearance conditions flow into GPCB Consent to Establish and later Consent to Operate, the full approval path sits under pollution control board approvals. Baseline data for the EIA, such as ambient air quality, noise and water quality, can be generated in Environ's own laboratory. Send an enquiry with your project capacity and location for a screening view.
A step-by-step look at how Environmental Clearance (EC) is typically carried out.
Determining whether the project falls under the EIA Notification 2006 schedule, and Category A or B.
Commissioning the air, water, soil and noise baseline studies and the Environmental Impact Assessment report where required.
For projects that require it, coordinating the mandatory public consultation process.
Submitting the EC application to the State or Central appraisal authority.
Tracking the specific environmental safeguard conditions attached to the Environmental Clearance.
Need help?
+91-72029-26676Talk to Environ's team about approvals, NABL-accredited testing, ETP/STP design or ESG reporting, and we'll guide you to the right service.
Call Us Anytime 24/7
+91-72029-26676The same in-house team delivering Environmental Clearance (EC) also handles every other environmental service we offer, backed by a NABL-accredited laboratory so testing is never outsourced to a third party. We work as a technical support partner to companies navigating Gujarat Pollution Control Board scrutiny, and our founder is empanelled as a Schedule II Environmental Auditor for the statutory audits certain industry categories must undergo. Our track record in groundwater permissions includes over 100 CGWA licenses secured across 17+ districts in Gujarat and neighbouring regions - because approvals, testing, compliance filing, and treatment plant design-build all sit with one team, findings from one stage inform the next instead of being reconstructed by a different vendor each time.
A quick look at the scale of environmental compliance work Environ India has delivered across Gujarat.
Happy customers
Annual Turnover
Project Completed
Years Of Experience
Experience Staff
Clients working with us on Environmental Clearance (EC) and our other environmental services share what it's like working with our engineers, lab team, and consultants.
A factory chimney may appear to be operating normally, but the gases released through it can contain pollutants that are...
A business may complete its Extended Producer Responsibility (EPR) registration, arrange plastic waste recycling, and pu...
Your Effluent Treatment Plant (ETP) may be running every day, with pumps operating, blowers functioning, and wastewater ...
A look at the environmental engineering and treatment projects we have delivered on the ground.