Project Overview

Environ undertook the design, engineering and commissioning of a 15 KLD (kilolitres per day) Effluent Treatment Plant (ETP) in Jamnagar, Gujarat, delivered as a complete design-build engineering project from process assessment through commissioning.

Scope of Work

  • Effluent characterization and treatability assessment to size the treatment process for the site's actual wastewater load
  • ETP process design and engineering, combining physico-chemical and biological treatment stages appropriate to the effluent characteristics
  • Equipment selection, civil-mechanical execution and on-site installation
  • Commissioning and performance trial runs prior to handover

The plant was engineered to treat effluent to a quality suitable for safe discharge or reuse, in line with Gujarat Pollution Control Board (GPCB) norms applicable to industrial effluent in the region — reflecting Environ's role as an environmental engineering service provider delivering compliant, site-specific treatment infrastructure rather than off-the-shelf equipment.